LOFT 32
A Pleasant Life in 1+1 and 2+1 Apartments
Located in Güzeloba neighborhood, built on a 2289 square meters land, consisting of 32 apartments, LOFT 32 project harbingers a high-standard of life. With its proximity to the sea and the airport, and unique architecture resembling Teras Park, it is candidate to become the new star of the region. In the project to be delivered in June 2018, entrance floors consist of 1+1, middle floors consist of 2+1 and duplex ones consist of 3+1 apartments.
Floor Plans
Interiors
• Veneered and/or lacquered cloakroom doors will be installed in the places shown in its project (if any) according to the decoration project.
KITCHENS:
• Veneered and/or lacquered kitchen cabinets specially designed according to its project, and counter tops made of natural stone and/or acrylic will be added.
• Built-in appliances to be used in kitchens (cooker, oven, hood or aspirator) will be Teka, Franke, Siemens or equivalent brand.
CEILING:
• Water based satin/plastic paint, decorative paint applications will be made on gypsum plaster or gypsum panel suspended ceiling in the apartments.
WALLS:
• Brick, pumice or gas concrete wall blocks will be used in properties and dimensions in accordance with the fire legislation; and water based satin paint application will be made on the gypsum plaster on the interior walls in accordance with the decoration project.
WET AREAS:
• According to the decoration project, 1st class domestic or imported ceramic, vitrified and fittings will be used on all wet areas.
• Bathtubs, flat shower pans or level shower system will be used in the bathrooms according to the apartment type and shower cabin will be installed.
• Six cabinet built-in washbasin or washbasins with shelves will be used according to the project.
LIVING ROOM AND ROOM FLOORS:
• Domestic or import laminated flooring will be applied on screed.
• Skirting board in accordance with the material used in the interior doors will be constructed.
ENTRANCE, CORRIDOR, KITCHEN and WET AREA FLOORS:
• Natural stone, ceramic or laminate application will be made according to the apartment types.
• Skirting boards will be made of material in harmony with the materials used in the interior doors used in the rooms.
MECHANICAL INSTALLATION:
• Individual system natural gas heating and hot water installation will be made, and each apartment will be delivered to be operated when the combi boiler and heater cores are installed as the installation will be made on each apartment.
• Samsung, Mitsubishi, Daikin or equivalent inverter air conditioning system will be installed in all apartments.
• In case of water cut and insufficient pressure, sufficient amount of water tank and distribution system will be used.
• Silent pipe will be used for wastewater and rain water drainage system.
FIRE-FIGHTING MEASURES:
• Measures will be taken considering Turkey Fire Protection Regulations.
ELECTRICITY:
• Decorative group switches and sockets will be used, and cabling and lighting infrastructure will be established in accordance with the project.
• All sockets to be used in houses will be earthed type.
• Satellite and National Broadcasting Private Satellite Systems infrastructure will be installed in the building TV installations. In case decoder – receiver is provided by the user or in case of subscription, Satellite broadcasts and National Broadcasting Private Satellite Systems broadcasts will be possible to watch.
• The cables and pipes to be used will comply with the Fire Regulations.
• There will be residual current relay in the apartments.
ELEVATORS:
• Large-volume, high-speed, ventilated elevators in model and brand according to the targeted project standard will be used.
Common Areas
• 32 apartments
• Indoor parking area under the buildings
• Pedestrian paths, hard ground and green landscaping areas
SOCIAL FACILITY:
Outdoor Swimming Pool
Children’s Playground
SECURITY:
• Entry and exit from controlled points for pedestrians and vehicles
• Intercom between the entrance security cabin and all apartments
• 7 x 24 camera security system
STRUCTURE:
• C 25 Class high strength concrete will be used in buildings which will be constructed with conventional formwork system.
• All buildings will be constructed on a reinforced concrete raft foundation system.
• Rainwater drainage system will be constructed for the foundation, construction environment and the site.
WATER, SOUND AND THERMAL INSULATION:
• Water insulation system will be installed under the raft foundation, basement floor, and exterior curtain walls and ceiling.
• The walls between the individual apartments will be soundproofed.
• Exterior facade will be sheathed.
ROOFS AND TERRACES:
• Brick or shingle covered roofs with thermal and water insulation in compliance with the technique will be formed. Heat and water insulation according to the technique will be made on the buildings without roof, and there will be ceramic or PVC coating.
FACADE:
• Partial natural stone, wooden-like ceramic, natural wood or equivalent materials will be used on the façade in accordance with the project.(The exterior is under the initiative of Altındal architecture.)
• Tempered or laminated glass or wrought iron railings will be used in the balconies according to the project. ( It is under the initiative of Altındal architecture.)
BLOCK ENTRANCES:
• There will be locked mailboxes and notice board will be in the lobby area, separate of each individual section.
• Camera and speaking module, LCD screen intercom panel will be installed at the block entrances.
• Natural stone, natural stone-like ceramic, marble or equivalent floor covering will be used at the block entrances in accordance with the architectural project.